1、工程概況
北京××科研實驗大樓工程位于北京市××區××路××號,總建筑面積29052m2,地下二層,地上十六層,結構型式為全現澆框架—簡體結構,建筑物檐高59.65m,總高65.40m。
該工程施工現場狹小,現場內設辦公用房和鋼筋加工廠、木工棚、成品、半成品及周轉材料堆放區域等,將民工生活區設在現場以外。
該工程工期630天(打樁降水除外)。
該工程處于北三環與北四環之間,南臨××路,為保障施工順利進行,特將消防保衛放在重點地位,而制訂該方案。
2、施工現場消防保衛情況分析
根據現場臨設及施工現場情況,預計本工地消防、保衛重點部位有如下幾處,為使工地達到市級文明現場的目標,確保不出現火災及失竊等事故,特將這幾處重點危險區提名到案,加強在施工中的管理。
(1)北京××科研實驗大樓工程屬全現澆框架一筒體結構高層建筑,施工過程中木材用量較大,大部分施工人員為民工,由于民工對消防知識懂得較少,防火意識差,思想容易麻痹,不定時會出現民工在現場違章吸煙情況,以及施工中的電焊焊花濺落容易發生火災。
(2)現場臨設材料庫、油庫和油料存放處等地方油類、漆類、易
1, Project Overview
Beijing × × research laboratory building project in the District, Beijing × × × × × × Road, with a total construction area of 29052m2, basement level, ground 16 level, full-cast frame structure type - simplified structure, building eaves high 59.65 m, total height 65.40m.
Narrow construction of the project site, on-site office space and equipped with steel plants, wood sheds, finished products, semi-finished and working materials such as stacking area will be set up in a migrant workers live outside the scene.
The project duration 630 days (other than piling precipitation).
The project is between the North Third Ring Road and North Fourth Ring Road, south × × Road, for the protection of the smooth construction, special emphasis will be placed on the status of fire protection, and development of the program.
2 Analysis of the construction site fire protection
Temporary site design and construction according to the scene, it is expected the fire site, there are several key positions to defend, for the site to achieve the goal municipal civil site, ensure there is no fire and theft and other incidents, especially these few key risk areas nomination in custody, the strengthening in construction management.
(1) × × Beijing research laboratory building project is a tube structure of the whole cast frame high-rise building, a larger amount of wood during construction, most construction workers for the workers, because workers know little knowledge of fire, fire safety awareness of poor Thought easy paralysis, irregular migrant workers in the field illegally will appear smoking, and construction welding welding fire flower splashed down easily.
(2) on-site temporary library set up materials, oil tanks and oil storage areas and so the local oil, paint, easy