施工作業指導書編制說明.doc
進入下載頁
施工作業指導書編制說明
1、本作業指導書系依據現行建筑施工規范、規程,總結合理成熟的施工工藝,結合現公司施工管理特點編制而成。
2、按照本公司發布的,本套施工作業指導書
3、本套作業指導書只對每一分項工程施工過程,按照正確的工藝程度實行指導控制,本身包含了對工程質量的保證,但工程質量驗收標準仍應按照國家現行有關規定執行。
4、有關專業分項工程,需專業施工如地下工程、baopo工程、除鉆孔灌注樁外的各類樁基、地下室施工圍護、玻璃幕墻安裝等工程應按施工圖紙要求專項單列施工技術方案,本套作業指導書未列入。
5、施工作業指導所陳述的屬通用性要求,施工
Preparation of construction work instructions note
1, the operating instructions is based on the current construction specifications and construction technology mature and reasonable sum, combined with construction management firm characteristics are compiled.
2, according to the company release, the construction of this set of operating instructions
3, has only this set of work instructions for each sub-project construction process, the correct processing services guiding control, itself contains a pair of construction quality assurance, but the quality of the project acceptance criteria continue to be governed countries, the existing regulations.
4, the professional sub-projects, required specialized construction such as engineering, blasting, in addition to all kinds of bored pile outside, the basement envelope construction, installation of glass curtain wall construction and other projects should be separate drawings required special construction technology programs , the set of operating instructions are not included.
5, construction is a general guide stated requirements, construction
2009-10/施工作業指導書編制說明.rar
