第一章 施工組織方案
1.1 施工測量
本工程施工測量的主要任務是:施工控制網的建立(包括全線主控制網的復測與施工控制網點的加密),施工細部結構以及形體的幾何尺寸,傾角、線型等精密定位,本工程涉及到工程測量與安裝測量兩方面的技術問題,測量技術含量高,施工測量精度要求高,因此我項目部將本工程施工測量列為首要工序,重點管理,要求測量部門技術超前,科學管理,及時總結,精益求精,以高質量、高效率地完成本工程施工測量任務。
1.1.1測量質量技術管理
(1)測量硬件設施配置:本工程中,將投入1臺高精度的全站儀,2臺高精度的精密水準儀,2臺J2經緯儀以及相關測量設備。
(2)測量人員配備:在本工程中我單位將調派富有市政道路施工測量經驗的測量工程師1名和測量工2名。
(3)測量技術管理:在本工程施工中擬建嚴格的測量校核、復核、審核技術管理制度,除在測量部門內部實行此制度進行自檢外,項目部實行項目總工程師、專職質檢員、測量技術主管三級參加的技術復核制度,單項技術干部參加并負責單項的測量技術復核工作,本工程測量技術管理流程見下圖。
Chapter Organization Plan
1.1 Construction Survey
Construction Survey of the main tasks are: Construction Control Network (including the full range of master control network and construction of complex test control network encryption), construction detail structure and shape of the geometric dimensions, angle, line, such as precision positioning, the project Surveying involves measuring and installation of two technical problems, high levels of measurement, construction measurement of high precision, so I project the Department will measure the construction process as a primary focus on management, ahead of required measurement sector technology, scientific management, timely summary of excellence, with high quality, high efficiency measurement tasks in this construction.
1.1.1 Measurement Quality and Technology Management
(1) measurement hardware configuration: this project will be put into a high precision of the total station, 2 sets of high accuracy, precision leveling, 2 J2 theodolite and related measuring equipment.
(2) measuring staffing: In this project I units will be deployed to the rich experience of the municipal road construction survey measurement and measurement engineers a working 2.
(3) Measurement and Management: In this strict construction of the proposed measurement check, review, audit technology management system, in addition to measuring the implementation of this system within the department to conduct self-inspection, the project chief engineer of the Ministry to implement the project, full-time quality control member of measurement technology to participate in the technical review of tertiary charge system, participation and individual technical cadres responsible for reviewing the work of individual measurement techniques, the project management process measurement shown below.