立交橋泵站深基坑施工應急預案.doc
進入下載頁
立交橋泵站深基坑施工應急預案
一、應急預案的方針與原則
堅持“安全第一,預防為主”、“保護人員安全優先,保護環境優先”的方針,貫徹“常備不懈、統一指揮、高效協調、持續改進”的原則。更好地適應法律和經濟活動的要求;給企業員工的工作和施工場區周圍居民提供更好更安全的環境;保證各種應急資源處于良好的備戰狀態;指導應急行動按計劃有序地進行;防止因應急行動組織不力或現場救援工作的無序和混亂而延誤事故的應急救援;有效地避免或降低人員傷亡和財產損失;幫助實現應急行動的快速、有序、高效;充分體現應急救援的“應急精神”。
二、應急策劃
(一)工程概況及地質條件
(1)工程概況
濟南市城區工程建設指揮部擬在經十路南側、鐵西路東側修建一座泵房站,建筑物長22.00米,寬度2.8-11.5米,基坑開挖深度12.00米,根據場地工程地質及水文地質條件,在基坑開挖和使用過程中需要進行臨時性基坑支護。
(2)工程地質
1、巖土工程條件
擬建場地地形平坦,地貌單元為山前沖洪積平原下部,場區內與基坑支護工程有關的底層主要為上部的填土及下部的沖洪積粉土和粘性土。
Overpass contingency plans for deep excavation pump
First, the policy and principles of the emergency plan
Adhere to the "safety first, prevention first" and "protecting the safety of priority, to protect the environment first" approach, implementation of the "safety, unity of command, and efficient coordination and continuous improvement" principle. Better adapt to the requirements of law and economic activities; to the work of employees and residents around the construction site area better and more secure environment; to ensure all emergency resources in a good state of readiness; guide emergency operations planned and orderly ; prevent inadequate emergency response organizations or on-site rescue the disorder and confusion and delay emergency plan; effectively avoid or reduce casualties and property losses; help achieve rapid response, orderly, and efficient; fully reflect the emergency rescue "contingency spirit."
Second, contingency planning
(A) Survey and Geological Engineering
(1) Project Overview
Construction headquarters in Jinan City to be in the south by the 10 Road, Rail Road east to build a pump station, building long 22.00 meters, width 2.8-11.5 m, excavation depth 12.00 m, according to geological sites and hydrological and geological conditions, in the excavation and the need for temporary use during excavation.
(2) Engineering Geology
1, geotechnical engineering conditions
The proposed flat site topography, geomorphology units for the piedmont alluvial plain of the lower part of field excavation projects in the region and the bottom of the main filling the top and bottom of the alluvial silt and clay.